![]() |
HOT ASPHALT | STANDARD COLD | |
---|---|---|---|
Guaranteed Permanent | ![]() |
![]() |
![]() |
Works in Water | ![]() |
![]() |
![]() |
No Tack Coat Required | ![]() |
![]() |
![]() |
No Bleeds | ![]() |
![]() |
![]() |
Open to Traffic Immediately | ![]() |
![]() |
![]() |
12 Month Shelf Life (Packaged) | ![]() |
![]() |
![]() |
Bulk Sacks | ![]() |
![]() |
![]() |
Stockpiles for 6-8 Months | ![]() |
![]() |
![]() |
No Fume Danger | ![]() |
![]() |
![]() |
Operational Versatility | ![]() |
![]() |
![]() |
Increased Traffic Disruption
Decreased Productivity
Risk Of Further Damage
Higher Costs
Decreased Time on the Job & Traffic Disruption
EZ Street Works in Water & All Weather
Storage Life (12 Months)
Increased Productivity
A recent university study by James Bearden, shows a cost savings of 72% when using EZ Street cold asphalt compared to hot mix asphalt repair. By comparing the cost of time and materials for each product he was able to calculate the percentage of cost savings. His final recommendation for Columbia’s Wastewater Department was to change the current, two-step paving process, to the one-step paving process using EZ Street asphalt repair. To learn more visit this page
* Average cost of combined man-hours and material needed to permanently repair street-cuts per cubic yard of placed asphalt mix (EZ Street cold asphalt)
** Average cost of combined man-hours and material needed to permanently repair street-cuts per cubic yard of placed asphalt mix (hot mix)