Skip to main content
HOT ASPHALT STANDARD COLD
Guaranteed Permanent
Works in Water
No Tack Coat Required
No Bleeds
Open to Traffic Immediately
12 Month Shelf Life (Packaged)
Bulk Sacks
Stockpiles for 6-8 Months
No Fume Danger
Operational Versatility

THE SAVINGS – YOUR WIN

Temporary Cold Mix And Hot Asphalt Patch

2 x Machinery

50%%

2 x Labor

50%%

2 x Material

50%%

Total

50%%

Increased Traffic Disruption

Decreased Productivity

Risk Of Further Damage

Higher Costs

The EZ Street Advantage

1 x Machinery

50%%

1 x Labor

50%%

1 x Material

50%%

Total

50%%

Decreased Time on the Job & Traffic Disruption

EZ Street Works in Water & All Weather

Storage Life (12 Months)

Increased Productivity

TRUE COSTS SAVINGS

A recent university study by James Bearden, shows a cost savings of 72% when using EZ Street cold asphalt compared to hot mix asphalt repair. By comparing the cost of time and materials for each product he was able to calculate the percentage of cost savings. His final recommendation for Columbia’s Wastewater Department was to change the current, two-step paving process, to the one-step paving process using EZ Street asphalt repair. To learn more visit this page

Download PDF Version